The insurance adjuster initially wanted to pack out the contents of the building. This was not an acceptable solution for the curator; regardless of the value of the items in the house, most of them are irreplaceable. The team contacted a fine arts and antique specialist who also warned that this would be a very bad idea. Even if a pack out had been an option, due to the magnitude of the catastrophe there wasn’t a qualified firm to perform the services and safely store the items during the drying process. The estimated cost of the pack out, proper storage of the rare items and the move back would have been approximately $500,000. The pack out was simply too risky and too expensive. With an estimated value of nearly $100 million, no one wanted to take a chance. The insurance adjuster certainly did not want to write a check to replace the contents should they be lost, damaged or stolen while they were off the premises.
The team started work immediately, providing emergency power with several large generators and contracting a HAZMAT water extraction team to remove the contaminated water from the basement and clean the area. Once removal was complete, the basement and crawlspaces were dried using the Water Out Convectant drying process.
With the removal of the standing water from the basement and the moisture trapped in the stone walls, the relative humidity in the building began dropping immediately. Now the concern was how to control the climate in the rest of the building. Without an operational HVAC system, it would be virtually impossible to maintain a temperature of 70 F and a RH of 50 percent in New Orleans in September (or any other month, for that matter).
Drying the basement was not a problem. However, upstairs in the museum, due to the delicate nature of the contents and the structure, restoring the climate to the preferred conditions of 70 F and 50 percent RH could not exceed a 5 percent rate of change per 4-hour period. The curator preferred an even slower rate of climate change. Water Out’s Convectant technology would not be the right tool for the museum. The team worked very closely with the curator, and through constant monitoring and the use of equipment specifically designed to solve the problem of maintaining the humidity level in buildings, the technicians were able to achieve a 2 percent rate of change in the climate. They kept the climate controlled until the HVAC system was replaced, more than six months after the start of the project.
The collection and home were saved. Inspections from fine arts appraisers stated that the efforts of Water Out Phoenix in mitigating the secondary damages were successful and resulted in zero claims for fine arts damages.
The final bill was $590,000, about the same cost as the initial estimate to pack out the priceless contents, and this included the subcontracted HAZMAT work. The mitigation effort was priceless to the curator and the community. An estimated net savings for the project totals almost $100 million.
It is important in every drying job to get the water out of the building and get the temperature and humidity under control as soon as possible, but the most important part of any job is understanding the building and contents, the concerns of the customer and what your equipment is capable of handling.
Water Out Phoenix recognized and embraced these very important facets of drying at Longue Vue House and Gardens. By employing the right equipment, closely monitoring the job and calling in the appropriate experts for assistance, they were able to save a historic building and a priceless collection of antique furniture and irreplaceable artwork while saving a sizable amount of money for the insurance company.